• The new Potain MDLT 1109 top-slewing crane addresses the needs of large-scale infrastructure projects in Europe with a 40 t maximum capacity and 11.1 t capacity at 80 m maximum reach.
• It builds on the success of the former MD 1100 with a more compact footprint, easier transportation, and more efficient assembly.
• The MDLT 1109 also includes the latest Potain technology including the P+ load curve, Potain CCS (Crane Control System), Potain CONNECT telematics, and Cab-IN internal mast operator lift.
• The equipment allows students to practice basic crane operations and become more familiar with the controls.
• Manitowoc has provided cranes and technical support to every local chapter of the IUOE across the U.S. and Canada for more than two decades.
• AUTAA, a French lifting company and subsidiary of transport and logistics giant Charles André Group (GCA), deployed its new 300 t GMK6300L-1 all-terrain crane to assemble prefabricated modules for a local hospital’s extension.
• The crane’s compact dimensions and quiet operation impressed from the outset, ensuring operations at the hospital continued with minimal impact from the expansion work.